Industry 4.0 Interconnection Requirements: A Machine-by-Machine Guide

Introduction
Since 2026 the Italian incentive for Industry 4.0 machines is no longer a tax credit, but the condition on the shop floor is the same: the machine has to be interconnected. This guide explains what interconnection means machine by machine, what to ask before buying, and how to document it.
What changed in 2026
From 1 January 2026, Italy no longer supports Industry 4.0 and 5.0 investments with a tax credit. Law no. 199 of 30 December 2025 (the 2026 budget law, article 1, paragraphs 427 to 436) replaced it with the iperammortamento: a higher tax value of the asset, used only to calculate depreciation. It is not a credit you offset in the F24 form.
The increase depends on the size of the investment:
| Investment | Increase |
|---|---|
| up to €2.5 million | 180% |
| over €2.5 and up to €10 million | 100% |
| over €10 and up to €20 million | 50% |
It covers investments made from 1 January 2026 to 30 September 2028 in new capital goods listed in Annexes IV and V of the law, which replace and update the old Annexes A and B of Law 232/2016. It also covers new plants that self-produce energy from renewable sources, sized up to 105% of the company's energy needs.
The condition that matters for a factory floor did not change: the goods must be interconnected to the company's production management system or to the supply network. Without interconnection there is no iperammortamento.
What Annex IV asks of a machine
Annex IV keeps the structure of the old Annex A. Machines in its first section, whose operation is controlled by computerised systems or managed through sensors and drives, must have all of these features:
- control by CNC (Computer Numerical Control) and/or PLC (Programmable Logic Controller);
- interconnection to the factory's IT systems, with remote loading of instructions and/or part programs;
- automated integration with the factory's logistics system, the supply network or other machines in the production cycle;
- a simple and intuitive human-machine interface;
- compliance with the latest safety, health and hygiene standards at work.
They also need at least two of these, which make them comparable to or integrable with cyber-physical systems:
- remote maintenance, remote diagnosis and/or remote control;
- continuous monitoring of working conditions and process parameters through suitable sensors, with adaptation to process drift;
- integration between the physical machine and a model or simulation of its own behaviour.
Point 2 is where most projects stumble. Interconnection is a two-way exchange: the machine sends its data (states, parts produced, alarms, consumption) and receives instructions from the company system (parameters, orders, programs), loaded remotely. A machine that only sends data is monitored, not interconnected.
Before buying: six questions for the supplier
The cheapest moment to solve an interconnection problem is before the order. Ask the supplier to answer in writing:
- Which point of Annex IV does this machine fall under?
- Which controller does it use (CNC, PLC), and which communication interfaces and protocols does it expose? Is the interface documented?
- Can it receive instructions or programs from our management system, or does it only send data?
- Which data does it make available: states, parts, alarms, energy consumption?
- Which two of the additional features does it have?
- Who connects it to our system, and by when? That date goes into the communications to the GSE.
If an answer is "we will see after installation", the risk stays with you.
How the project is documented
The procedure runs on the GSE platform, in three steps:
- booking: a preliminary communication, with the planned interconnection date;
- confirmation: with down payments of at least 20% of the cost;
- completion: once the investments are finished, and in any case by 15 November 2028.
Two documents prove what was done, under articles 6 and 7 of the implementing decree of 7 May 2026: a sworn technical appraisal (perizia tecnica asseverata), which certifies the technical features and the interconnection, and an accounting certification of the costs. The appraisal is signed by an engineer or an industrial expert registered with their professional body, or issued as an attestation by an accredited certification body.
An appraiser can only certify what can be shown. Collect the evidence while the project is running, not at the end:
- the list of machines, with model and serial number;
- which data each machine exchanges with the company system, and in which direction;
- a diagram of the connection, from the machine to the system;
- the date each machine was actually interconnected;
- proof of the exchange: an instruction sent from the system and received by the machine, and the data that comes back.
Four common mistakes
Confusing monitoring with interconnection. A sensor that reads the temperature of a paint booth is useful, but it does not make the booth interconnected. Annex IV asks for a two-way exchange with the company system.
Loading instructions by hand. A USB stick, or an operator typing parameters into the machine, is not remote loading.
Writing the documentation at the end. Months later nobody remembers when a machine was connected or what it exchanged, and the appraisal rests on memory.
Buying first, checking later. Whether a machine fits Annex IV is a question for the order, not for the appraisal.
Where Mative fits
Mative builds the interconnection and keeps the evidence of it. It does not sign the appraisal and does not certify the machines: that is the appraiser's job. We support you with the technical requirements and the documentation.
- Synapsis ISBC Gateway, an industrial computer developed by Mative with Industrial Shields, mounts on the DIN rail and talks to the PLC through industrial protocols such as Modbus, OPC UA and BACnet.
- Mative Cloud TC – Things Connector receives and stores the data, and sends parameters and commands back to the machine: the exchange goes both ways.
- Mative Cloud TC: SCADA Module, built for each plant, shows the people in production what is running, what is stopped and why, and the OEE of every machine, line and shift.
- Mative Cloud TC: Smart Metering Module measures the energy produced and consumed, department by department: the figure you need to size a self-production plant within 105% of your needs.
Because the data is collected every day, the project documentation does not have to be rebuilt at the end: connection dates, data exchanged and instructions sent are already recorded.
Conclusion
The incentive changed name and mechanism, but the work in the factory is the same: choose machines that can exchange data both ways, connect them to the company system, and keep the evidence while you do it. Ask the questions before the order, put the interconnection date in the GSE communications, and collect the proof as the project runs.
Want to know which of your machines are already interconnected and what is missing? Request a demo: in 20 minutes we look at it together.
Sources
- Law no. 199 of 30 December 2025, article 1, paragraphs 427-436, and Annexes IV and V
- MIMIT, Nuovo Piano Transizione 5.0: Iperammortamento
- MIMIT, interministerial decree of 7 May 2026, implementing rules
- GSE, guide and forms for the Nuovo Piano Transizione 5.0
Sources checked on 21 October 2026. Rules change: check the official texts and the GSE instructions with your appraiser before you decide.